top of page

1 : Industrialised Building System

Objectives: 

  1. To develop students’ understanding in different types of IBS construction method.

  2. To apply appropriate IBS construction method in the production of a model for an apartment building.

  3. To demonstrate a comprehensive understanding of IBS construction process through model making.

  4. To develop students’ understanding in matters related to energy efficiency and ecological impact.

  5. To foster good communication skills among group members through proper delegation of works and production of the video.

Learning Outcomes:

  1. Identify and collect relevant research data.

  2. Explain a set of architectural and structural documentation.

  3. Relate basic structural elements and structural principles in construction.

  4. Analyse and document construction methods and materials.

  5. Critique issues pertaining to energy efficiency, embodied energy as well as ecological impact.

2 : Construction Solutions

Objectives: 

  1.  To encourage analytical and critical study of the principles, practices and details of building technology in the student’s own design.

  2. To encourage students to consider the construction aspects throughout the design process.

  3. To adapt and implement the alternative construction systems into the students’ design.

Learning Outcomes:

  1. Analyse and document construction methods and materials

  2. Evaluate existing construction system and detailing of the selected project.

  3. Critique issues pertaining to construction principles, materials, techniques, codes of practice, process of assembly, and detailing.

  4. Generate alternative construction solutions by means of sketches and drawings.

© adibah awang, 1995

bottom of page